BladeCenter HS21 Cluster, Xeon dual core, 3 GHz, GigEthernet

Site: Geoscience (P)
Manufacturer: IBM
Cores: 2,944
Processor: Xeon 5160 2C 3GHz
Interconnect: Gigabit Ethernet
Installation Year: 2008
Performance
Linpack Performance (Rmax) 14.53 TFlop/s
Theoretical Peak (Rpeak) 35.33 TFlop/s
Power Consumption
Power: 280.00 kW
Software
Operating System: Linux
List Rank System Vendor Total Cores Rmax (GFlop/s) Rpeak (GFlop/s) Power (kW)
11/2008 401 BladeCenter HS21 Cluster, Xeon dual core, 3 GHz, GigEthernet IBM 2,944 14.53 35.33 280.00
06/2008 190 BladeCenter HS21 Cluster, Xeon dual core, 3 GHz, GigEthernet IBM 2,944 14.53 35.33 280.00