Site: | Semiconductor Company (C) |
---|---|
Manufacturer: | IBM |
Cores: | 2,448 |
Processor: | Xeon 5160 2C 3GHz |
Interconnect: | Gigabit Ethernet |
Installation Year: | 2008 |
Performance | |
Linpack Performance (Rmax) | 12.08 TFlop/s |
Theoretical Peak (Rpeak) | 29.38 TFlop/s |
Power Consumption | |
Power: | 233.00 kW |
Software | |
Operating System: | Linux |
List | Rank | System | Vendor | Total Cores | Rmax (GFlop/s) | Rpeak (GFlop/s) | Power (kW) |
---|---|---|---|---|---|---|---|
06/2008 | 288 | BladeCenter HS21 Cluster, Xeon dual core, 3 GHz, GigEthernet | IBM | 2,448 | 12.08 | 29.38 | 233.00 |