BladeCenter HS21 Cluster, Xeon dual core, 3 GHz, GigEthernet

Site: Geoscience (P)
Manufacturer: IBM
Cores: 1,604
Processor: Xeon 5160 2C 3GHz
Interconnect: Gigabit Ethernet
Installation Year: 2007
Performance
Linpack Performance (Rmax) 7.92 TFlop/s
Theoretical Peak (Rpeak) 19.25 TFlop/s
Power Consumption
Power: 152.00 kW
Software
Operating System: Linux
List Rank System Vendor Total Cores Rmax (GFlop/s) Rpeak (GFlop/s) Power (kW)
11/2007 285 BladeCenter HS21 Cluster, Xeon dual core, 3 GHz, GigEthernet IBM 1,604 7.92 19.25 152.00