Site: | Financial Institution |
---|---|
Manufacturer: | HPE |
Cores: | 676 |
Processor: | Xeon 5160 2C 3GHz |
Interconnect: | Gigabit Ethernet |
Installation Year: | 2007 |
Performance | |
Linpack Performance (Rmax) | 5.03 TFlop/s |
Theoretical Peak (Rpeak) | 8.11 TFlop/s |
Software | |
Operating System: | Linux |
List | Rank | System | Vendor | Total Cores | Rmax (GFlop/s) | Rpeak (GFlop/s) | Power (kW) |
---|---|---|---|---|---|---|---|
06/2007 | 294 | Cluster Platform 3000 BL460c, Xeon 51xx 3.0GHz, GigEthernet | HPE | 676 | 5.27 | 8.11 |